Skip to main content
Loading…
This section is included in your selections.

A. Developers of all new subdivisions who will be serving the lots with city water shall be required to install all the water service lines from the water main to the lot property line before the paving of the street. The director shall establish standards for these installations.

B. A meter installation charge, for installation of a water meter on these developer-installed service lines, shall be due when an application for water service for each individual lot is made. This meter charge shall be paid in lieu of the city’s service installation charge. The meter installation charge for a three-quarter inch meter shall be as established by the city council by periodic resolution. The charge for larger meters shall be set by the director and recover all city material and labor costs. (Ord. 016/2021 § 2)