Skip to main content
Loading…
This section is included in your selections.

All charges and costs of installation of such standby water connections shall be paid by the customer, and shall include the regular cost of installation of the size line desired by the customer, plus ten percent. No meter shall be involved. (Ord. 541, 1971)