Skip to main content
Loading…
This section is included in your selections.

The zoning administrator may administratively grant an exception to the mandatory six-year development moratorium with public notice, per the noticing requirements of MMC 22.84.050, to allow the construction of one single-family dwelling unit and associated accessory structures, when the following requirements are met:

A. General Requirements.

1. The area that is permitted to be developed shall not exceed the minimum lot size for the underlying zoning district, in addition to the minimum area necessary to provide safe vehicular access;

2. The construction of the single-family dwelling, permitted accessory structures, landscaped area, and access road are in compliance with all applicable city regulations;

3. Corrective actions are proposed to mitigate damage caused by the nonpermitted action, through the submittal of a reforestation or mitigation plan prepared by a qualified professional;

4. Upon approval of a single-family dwelling unit exception, the landowner will record the approved site plan with Snohomish County auditor depicting the area of the parcel to be dedicated for the single-family dwelling, yard area, permitted accessory structures, and access road; and

5. The development moratorium shall remain in effect for all other nonforestry uses of the site.

B. Required Written Findings and Determinations. The zoning administrator will address the items listed in subsection (A) of this section as written findings and determinations before issuing a decision. (Ord. 005/2019 § 10 (Exh. B))