Eligible facilities requests shall be reviewed pursuant to this section.

A. Definitions. The following definitions shall apply to eligible facilities requests only as described in this section and shall not apply throughout this chapter.

1. “Base station” means a structure or equipment at a fixed location that enables FCC-licensed or authorized wireless communications between user equipment and a communications network. The term does not encompass a tower as defined herein nor any equipment associated with a tower. “Base station” includes, without limitation:

a. Equipment associated with wireless communications services as well as unlicensed wireless services and fixed wireless services such as microwave backhaul.

b. Radio transceivers, antennas, coaxial or fiber optic cable, regular and backup power supplies, and comparable equipment, regardless of technological configuration (including distributed antenna systems (“DAS”) and small wireless facilities).

c. Any structure other than a tower that, at the time the relevant application is filed (with jurisdiction) under this section, supports or houses equipment described in subsections (A)(1)(a) and (A)(1)(b) of this section that has been reviewed and approved under the applicable zoning or siting process, or under another state or local regulatory review process, even if the structure was not built for the sole or primary purpose of providing that support.

d. The term does not include any structure that, at the time the relevant application is filed with the city under this section, does not support or house equipment described in subsections (A)(1)(a) and (A)(1)(b) of this section.

2. “Collocation” means the mounting or installation of transmission equipment on an eligible support structure for the purpose of transmitting and/or receiving radio frequency signals for communication purposes.

3. “Eligible facilities request” means any request for modification of an existing tower or base station that does not substantially change the physical dimensions of such tower or base station, involving:

a. Collocation of new transmission equipment;

b. Removal of transmission equipment; or

c. Replacement of transmission equipment.

4. “Eligible support structure” means any tower or base station as defined in this section; provided, that it is existing at the time the relevant application is filed with the city.

5. “Existing” means a constructed tower or base station if it has been reviewed and approved under the applicable zoning or siting process, or under another state or local regulatory review process; provided, that a tower that has not been reviewed and approved because it was not in a zoned area when it was built, but was lawfully constructed, is existing for purposes of this definition.

6. “Site” means, for towers other than towers in the public rights-of-way, the current boundaries of the leased or owned property surrounding the tower and any access or utility easements currently related to the site, and, for other eligible support structures, further restricted to that area in proximity to the structure and to other transmission equipment already deployed on the ground. The current boundaries of a site are the boundaries that existed as of the date that the original support structure or a modification to that structure was last reviewed and approved by a state or local government, if the approval of the modification occurred prior to the Spectrum Act or otherwise outside of the Section 6409(a) process.

7. “Substantial change” means a modification substantially changes the physical dimensions of an eligible support structure if it meets any of the following criteria:

a. For towers other than towers in the public rights-of-way, it increases the height of the tower by more than ten percent or by the height of one additional antenna with separation from the nearest existing antenna, not to exceed twenty feet, whichever is greater; for other eligible support structures, it increases the height of the structure by more than ten percent or more than ten feet, whichever is greater.

i. Changes in height should be measured from the original support structure in cases where deployments are or will be separated horizontally, such as on buildings’ rooftops; in other circumstances, changes in height should be measured from the dimensions of the tower or base station, inclusive of originally approved appurtenances and any modifications that were approved prior to the passage of the Spectrum Act.

ii. The separation of antennas is measured by the distance from the top of the existing antennas to the bottom of the new antennas;

b. For towers other than towers in the public rights-of-way, it involves adding an appurtenance to the body of the tower that would protrude from the edge of the tower more than ten feet, or more than the width of the tower structure at the level of the appurtenance, whichever is greater; for other eligible support structures, it involves adding an appurtenance to the body of the structure that would protrude from the edge of the structure by more than six feet;

c. For any eligible support structure, it involves installation of more than the standard number of new equipment cabinets for the technology involved, but not to exceed four cabinets; or, for towers in the public streets and base stations, it involves installation of any new equipment cabinets on the ground if there are no preexisting ground cabinets associated with the structure, or else involves installation of ground cabinets that are more than ten percent larger in height or overall volume than any other ground cabinets associated with the structure;

d. It entails any excavation or deployment outside the current site, except that, for towers other than towers in the public rights-of-way, it entails any excavation or deployment of transmission equipment outside of the current site by more than thirty feet in any direction. The site boundary from which the thirty feet is measured excludes any access or utility easements currently related to the site;

e. It would defeat the concealment elements of the eligible support structure; or

f. It does not comply with conditions associated with the siting approval of the construction or modification of the eligible support structure or base station equipment; provided, however, that this limitation does not apply to any modification that is noncompliant only in a manner that would not exceed the thresholds identified above.

8. “Tower” means any structure built for the sole or primary purpose of supporting any FCC-licensed or authorized antennas and their associated facilities, including structures that are constructed for wireless communications services including, but not limited to, private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul and the associated site.

9. “Transmission equipment” means equipment that facilitates transmission for any FCC-licensed or authorized wireless communication service, including, but not limited to, radio transceivers, antennas, coaxial or fiber-optic cable, and regular and backup power supply. The term includes equipment associated with wireless communications services including, but not limited to, private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul.

B. Application. The director shall prepare and make publicly available an application form which shall be limited to the information necessary for the city to consider whether an application is an eligible facilities request. The application may not require the applicant to demonstrate a need or business case for the proposed modification.

C. Type of Review. Upon receipt of an application for an eligible facilities request pursuant to this chapter, the director shall review such application to determine whether the application qualifies as an eligible facilities request.

D. Time Frame for Review. Within sixty days of the date on which an applicant submits an application seeking approval under this chapter, the director shall approve the application unless it determines that the application is not covered by this section.

E. Tolling of the Time Frame for Review. The sixty-day review period begins to run when the application is filed with the city, and may be tolled only by mutual agreement by the director and the applicant, or in cases where the director determines that the application is incomplete. The time frame for review of an eligible facilities request is not tolled by a moratorium on the review of applications.

1. To toll the time frame for incompleteness, the director shall provide written notice to the applicant within thirty days of receipt of the application, clearly and specifically delineating all missing documents and/or information required in the application.

2. The time frame for review begins running again when the applicant makes a supplemental submission in response to the city’s notice of incompleteness.

3. Following a supplemental submission, the director will notify the applicant within ten days that the supplemental submission did not provide the information identified in the original notice delineating missing information. The time frame is tolled in the case of second or subsequent notices pursuant to the procedures identified in this subsection. Second or subsequent notices of incompleteness may not specify missing documents or information that was not delineated in the original notice of incompleteness.

F. Determination That Application Is Not an Eligible Facilities Request. If the director determines that the applicant’s request does not qualify as an eligible facilities request, the director shall deny the application. In the alternative, to the extent additional information is necessary, the director may request such information from the applicant to evaluate the application under other provisions of this chapter and applicable law.

G. Failure to Act. In the event the director fails to approve or deny a request for an eligible facilities request within the time frame for review (accounting for any tolling), the request shall be deemed granted. The deemed grant of the eligible facilities request does not become effective until the applicant notifies the director in writing after the review period has expired (accounting for any tolling) that the application has been deemed granted. (Ord. 008/2022 § 4 (Exh. B))